Project

Scope of Work

Client

Year of Completion

Energy Efficiency Strategy of Macedonia (Prime Consultant NEXANT Inc,
Washington DC, USA)

Analysis
Study

Government
of Macedonia,
Ministry of Economy

2003

Adaptation of the grid station 110/35/10 kV "Radovis" for remote control from National Dispatch Centre

Detailed Design
Construction
Commissioning

Electric Power Company of Macedonia

2003

Rehabilitation of Electric power supply networks in the villages of: Tanushevci, Brest and Malina Maala

Detailed Design

IMG - International
Management Group,
Skopje, Macedonia

2003

Rehabilitation of Electric power supply network in the village of Tanushevci - 10 kV lines and substations 10/0,4 kV (Financed by IMG - International Management Group)

Construction

Electric Power Company
of Macedonia

2003

Rehabilitation of Control and Protection System at HPP Globocica – Macedonia (Prime Contractor: Emerson Process Management Power and Water Solutions, Pittsburg, USA)

Detailed Design
Delivery of
equipment
Installation and
construction
Commissioning

Electric Power Company of Macedonia

2003

35 kV overhead line between substations "Ohrid 1" and "Gradiste"

Detailed Design

Power Distribution Utility of
Ohrid City, Macedonia

2003

 
     
 